Bandar Bukit Raja 3
Ground improvement.
KNT CONSULT SDN. BHD.Geotechnical Consulting Services
Past Projects
Year to-date 2026
Ground improvement.
Lots 1023, 1024, 640, 1020, 1021, 484, 1423, 1424, 1430, 1434, 1436, 1437, 1440, 482, 688, 1433, 1876, 1439, 4157, 930, 968, 1000, 1427, 15362, 15361, 15360, 15359 and 15358. Client: Sime Darby Landscaping Sdn. Bhd. (Sept 2014–Dec 2015). 1,554 acres of mixed development—Jabatan Kawasan Sensitif Alam Sekitar (JKTSAS) geotechnical submission as part of KM submission. Soil investigation planning, cut-and-fill earthwork planning, settlement and stability checks, and foundation design for bridges and utilities.
Ground treatment design for the industrial land, including soil reinforcement abutting the TNB transmission tower.
Finite element analysis (PLAXIS) and report preparation on the effect of pipe-jacking works on the running railway track.
Two warehouse blocks with column loads of 35,000 kN—soil investigation planning, bored pile design for warehouse columns, spun pile design for mattress piling with consideration of downdrag, ground treatment, foundation design for utilities, construction support and monitoring.
Demolition of the existing narcotic centre and construction of a new narcotic hub—soil investigation planning and interpretation, earthwork profile planning, slope stability checks, retaining wall and sheet pile stability checks, settlement analysis, foundation recommendations, construction support and monitoring.
Demolition of the existing border control centre and construction of a new centre—soil investigation planning and interpretation, earthwork profile planning, slope stability checks, settlement analysis, foundation recommendations, construction support and monitoring.
1,000 acres of development land for residential and industrial use—geotechnical report for EIA submission, infrastructure and building platform ground treatment works, building foundation design, infrastructure foundation design, construction support and monitoring.
Replacement of the old 33 km gas pipelines from Kertih to Kijal—soil investigation planning and interpretation, slope stability analysis of existing and proposed slopes, construction support and monitoring.
One 46-storey serviced apartment block with three basement levels on granite formation—soil investigation planning and interpretation, bored pile foundation design, soil nail reinforced cut slope, basement retaining structure design, tendering exercise, construction support and monitoring.
Double-volume luxury serviced apartment on the Bangsar Kenny Hill Formation—soil investigation planning, bored pile design, tender exercise, construction support and monitoring.
Preparation of terrain mapping and geotechnical assessment reports as part of the Environmental Impact Assessment submission. Soil investigation planning and interpretation, foundation recommendations and slope stability checks.
Piled foundation design.
Slope stability analysis.
Independent Geotechnical Consulting Engineer (ICE) to Kementerian Pendidikan Malaysia.
Independent Geotechnical Consulting Engineer (ICE) to Kementerian Pendidikan Malaysia.
Alternative design of piling and pilecap.
Preparation and submission of terrain mapping report.
Preparation and submission of terrain mapping report.
Piled foundation design.
Piled foundation design.
Ground treatment design, building foundation design, and supporting ancillaries.
Planning of soil investigation works, foundation design for buildings, and supporting ancillaries.
Slope remedial works for failed slopes.
Contiguous bored pile design.
Ground treatment design and foundation design for bridges.
Ground treatment design, building foundation design, and supporting ancillaries.
Alternative bridge approach foundation design for seven bridges and finite element analysis of embankment consolidation settlement.
One 36-storey and one 35-storey serviced apartment block with amenities—soil investigation planning, bored pile foundation design over karstic limestone formation, tendering exercise, construction support and monitoring.
Micropile design.
Slope stability analysis, building foundation design, and geotechnical report preparation.
Ground treatment and foundation design for proposed retaining structures.
Ex-mining lake reclamation and ground treatment works for embankment filling.
Piled foundation design at limestone formation.
Contiguous bored pile design and building foundation design.
Bridge foundation and ground treatment works.
Foundation and ground treatment works.
Independent geotechnical assessment for basement excavation works.
Geotechnical assessment of slope stability and geological mapping report.
Terrain mapping report, geotechnical input, and foundation design.
Geotechnical input and foundation design.
Geotechnical input and ground treatment design.
Geotechnical assessment report of slope stability for submission to Majlis Perbandaran Kajang.
Geotechnical assessment report of slope stability for submission to Majlis Perbandaran Kajang.
Geotechnical input, ground treatment, and foundation design.
Geotechnical input and foundation design.
Geotechnical input and foundation design.
Geotechnical input and foundation design.
Geotechnical assessment report.
Geotechnical assessment and independent checker.
Foundation design and ground treatment.
Geotechnical input.
Independent Checking Engineer.
Geotechnical input and foundation design.
Ground treatment and foundation recommendations.
Geotechnical input and foundation design.
Geotechnical design for bungalow over slope.
Independent Checking Consulting Engineer.
Geotechnical assessment report.
Geotechnical design works.
Bored pile foundation design works.
Ground improvement and foundation design works.
Piled foundation design.
Slope stability report.
Contiguous bored pile design.
Terrain mapping report, construction suitability map, and geotechnical assessment report.
Foundation recommendation for hotel extension.
Independent Checking Engineer (ICE) for PLUS.
Geotechnical assessment report, foundation recommendation, and ground treatment works.
Geotechnical assessment report and foundation recommendation.
Assessment and remedial works for RC wall.
Reclamation of shoreline, ground treatment, and foundation design.
Reclamation of mining pond, building foundation design, and geotechnical assessment report.
Geotechnical assessment report.
Cut/fill slope analysis and foundation design.
Geotechnical repair assessment report.
Geotechnical assessment report.
Foundation design and ground improvement works.
Foundation design.
Foundation and basement excavation design.
Finite element design for combination sheet pile.
Foundation design and ground improvement works.
ICE for geotechnical works.
Alternative foundation design.
FEM design and piled foundation design.
Stability analysis for cut slope.
Pile capacity calculation, maintained load test back analyses, and FE analyses for 13.7m excavation.
Geotechnical assessment and design report.
Stability check for cut slope and crib wall.
Flow net analyses and finite element analysis for 12m excavation.
Finite element analyses for 12m deep excavation.
Finite element analyses for offshore cofferdam.